AveoGlobal
Method

The Manual Work Ledger

We treat a function’s manual work the way a balance sheet treats assets: inventoried, valued, and reconciled against what actually happened.

  1. 01

    Inventory the work, not the process

    Manual Load lives between the steps of the process map: re-keying, reconciling, chasing, checking, reformatting, routing, explaining. We build the inventory at task level from work sampling, system logs and structured interviews with the people doing the work.

  2. 02

    Price it

    Every task line gets fully loaded hours, cost, and a Manual Load percentage for the team and the function. It is usually the first time that number has existed in the organization.

  3. 03

    Sort by realizability, not automatability

    Every opportunity sits on two axes: can it be eliminated, and can the value be converted. Value converts through one of four paths: growth absorbed without hiring, a backfill avoided as people leave, redeployment to work with a measurable output, or a cycle-time gain that changes cash. No path and no owner scores zero, however automatable the work.

  4. 04

    Eliminate in the operator's order: stop, simplify, automate

    First ask whether the work should exist at all. Then simplify: a rule change or a field added upstream removes more manual work than a bot. Only then automate, with AI where the work is unstructured or judgment-shaped and plain integration where it is not. Automation is the expensive option and is spent on the work that genuinely needs it.

  5. 05

    Realize through a Value Contract

    Each elimination ships with a one-page Value Contract: the opportunity, its conversion path, a named owner, a date, the cost line it will move, and a finance sign-off. It closes the Realization Gap, and clients keep using it after we leave.

  6. 06

    Compound

    The Ledger becomes a standing management instrument: a quarterly Manual Load review owned by the function head, with your own people trained to run the inventory.

The rule that reorders most roadmaps

Automatable is not the same as realizable. The most automatable item on a list is often the least likely to change a cost line. The boring item with a willing owner and a clear conversion path is the one that lands.

Know your team’s Manual Load before anyone pitches you anything.

Five minutes gives you a defensible first number. Forty-five minutes turns it into a one-page estimate you can take upward.

★★★★★5.0 on every engagement · Founded by an ex-Citi automation operator · No deck, no sales sequence.